Reviews For Keith Pedersen
CONE-2110
Construction Business Methods
Life could be spent in more useful places
I would give him a higher score, but he never held to the syllabus schedule, and never gave you enough time to get something done. The second exam was nearly a month after he said it would be, and he told us when it was TWO DAYS before the test. The final project information and rubric wasn't posted until SIX days before we started giving the presentations. In this time we had to basically design an entire construction project AND make a presentation about it. Shouldn't instructors give you longer for this kind of stuff?
I would say he knows the material, but that sort of thing is hard to say considering all he does it literally read you the slide presentations. That isn't teaching...it is 3rd grade Reading class.
| Overall | ![]() ![]() ![]() ![]() ![]() |
Knowledge | ![]() ![]() ![]() ![]() ![]() |
Speech | ![]() ![]() ![]() ![]() ![]() |
Availability | ![]() ![]() ![]() ![]() ![]() |
| Tangents | ![]() ![]() ![]() ![]() ![]() |
Homework | ![]() ![]() ![]() ![]() ![]() |
Exams | ![]() ![]() ![]() ![]() ![]() |
Grade Recieved | A |
| Class Taken Spring 2009 | |||||||
CNST-3780
Construction Estimating
Very unorganized and not very well prepared to answer students questions.
| Overall | ![]() ![]() ![]() ![]() ![]() |
Knowledge | ![]() ![]() ![]() ![]() ![]() |
Speech | ![]() ![]() ![]() ![]() ![]() |
Availability | ![]() ![]() ![]() ![]() ![]() |
| Tangents | ![]() ![]() ![]() ![]() ![]() |
Homework | ![]() ![]() ![]() ![]() ![]() |
Exams | ![]() ![]() ![]() ![]() ![]() |
Grade Recieved | B |
| Class Taken Spring 2007 | |||||||
![[*]](img/smallStarOn.gif)
![[ ]](img/smallStarOff.gif)